Residential-led mixed use development, Phase 3 of a large, multi-phase development – Overall development delivering 2500+ homes, Phase 3 has 526 apartments in 3 buildings including 36 story towers. Central chilled water system providing comfort cooling for apartments.

Oval Village
Client : Berkley Homes
Comprised of a collection of stylish Manhattan, 1, 2 & 3 bedroom apartments, Oval Village offers an exceptional lifestyle for its residents with stunning onsite facilities including a cinema, gymnasium, 24-hour concierge, luxurious swimming pool, residents’ lounge and work space.
Ellipsoid Design Engineering : EDE were appointed to carry out the full coordination of M&E systems modelling and drawing production, including new hot water, gas installation and small power. Using Revit, 3D models were created and integrated LOD 400 for the scope of the work. It was the need of the project to have Architectural, Structural, and MEPF BIM services. Not only this but the project had integrated MEP BIM Coordination and Clash Detection to make the project flow easier, simpler, and faster.
Connect with Us Today
Looking for expert guidance? Our team is ready to assist. Request a callback now and discuss how we can help bring your project to life.