Data Center, Germany
Client : Exyte
The project features a high level of modularity and prefabrication with positive effects on environment. The data center is a TIER III+, 100% concurrently maintainable. The data center’s demand will be matched with clean energy on a year by year, and it will use a flexible combination of adiabatic and dry cooling mode to mitigate risk of water scarcity taking climate change progression into consideration.
Ellipsoid Design Engineering : The EDE scope involves MEP modeling using Autodesk Revit. The Level of Detailing for the project was LOD 350. The model was used for coordination and the extraction of the shop drawings. We performed coordination work among all trades in a rigorous manner that reduced clashes and saved time and money for the project. Over 52 RFI’s were raised with 3D snap shots pertaining to Missing & Conflicting Data, Constructability/ Aesthetic Issues, Maintenance Issues and Accessibility Issues. Pipes, Ducts and Cable Trays were re‐routed to reduce fittings and cost. Over 400 Clashes were resolved which involves around 50 critical clashes arises due to clash of ducts and pipes with the structure and also maintenance accessibility issues.
Speak with Our Experts
Have questions about your project? Our specialists are here to help. Request a callback today and get expert guidance tailored to your specific needs.